Skip to content

fix(tests): resolve final GLiNER test failures #72

fix(tests): resolve final GLiNER test failures

fix(tests): resolve final GLiNER test failures #72

Triggered via push May 30, 2025 04:17
Status Failure
Total duration 4m 23s
Artifacts

ci.yml

on: push
Matrix: build
Matrix: test-core
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 139.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.12)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.