Milestones

List view

  • No due date
    0/3 issues closed
  • Overdue by 9 year(s)
    Due by June 15, 2016
    0/5 issues closed
  • Milestone for tracking ideas we probably don't need to do but may want to do.

    No due date
    1/3 issues closed
  • Overdue by 9 year(s)
    Due by May 31, 2016
    0/4 issues closed
  • Overdue by 9 year(s)
    Due by May 3, 2016
    1/3 issues closed
  • "Polished" version of beta demo.

    Overdue by 9 year(s)
    Due by August 26, 2016
  • Issues to be completed at the close of the Feb. 29-March 2 Hackathon.

    Overdue by 9 year(s)
    Due by March 2, 2016
    16/16 issues closed
  • Overdue by 10 year(s)
    Due by February 25, 2016
    4/4 issues closed
  • End-to-ending modeling example with RHESSys and co-benefits models In addition to the ability to design GI elements using the bird view, the system needs to support parameterizing the designs in our supported models (RHESSys and co-benefits, eventually also IUHM), as well as enabling the users to run the models, and to visualize reports and model outputs. For this milestone, we will focus on enabling this end-to-end analysis using data and models from the existing DR5 study area, including adding the concept of a study region (and the ability to include and visualize regional geospatial datasets that span more than one study area; e.g. hazard vulnerability, GI site suitability), and adding the concept of a GI scenario, so that differing GI designs can be grouped and analyzed (and their analyses compared). In a subsequent milestone, we will add support for populating the system with data and models for new study areas.

    Overdue by 9 year(s)
    Due by July 15, 2016
    3/3 issues closed
  • Post Feb.-March Hackathon issues related to on-going CyberSEES work that needs to be address after the Sept. GI-Venture demo.

    Overdue by 9 year(s)
    Due by April 5, 2016
    4/20 issues closed