List view
- No due date•0/3 issues closed
- Overdue by 9 year(s)•Due by June 15, 2016•0/5 issues closed
Milestone for tracking ideas we probably don't need to do but may want to do.
No due date•1/3 issues closed- Overdue by 9 year(s)•Due by May 31, 2016•0/4 issues closed
- Overdue by 9 year(s)•Due by May 3, 2016•1/3 issues closed
"Polished" version of beta demo.
Overdue by 9 year(s)•Due by August 26, 2016Issues to be completed at the close of the Feb. 29-March 2 Hackathon.
Overdue by 9 year(s)•Due by March 2, 2016•16/16 issues closed- Overdue by 10 year(s)•Due by February 25, 2016•4/4 issues closed
End-to-ending modeling example with RHESSys and co-benefits models In addition to the ability to design GI elements using the bird view, the system needs to support parameterizing the designs in our supported models (RHESSys and co-benefits, eventually also IUHM), as well as enabling the users to run the models, and to visualize reports and model outputs. For this milestone, we will focus on enabling this end-to-end analysis using data and models from the existing DR5 study area, including adding the concept of a study region (and the ability to include and visualize regional geospatial datasets that span more than one study area; e.g. hazard vulnerability, GI site suitability), and adding the concept of a GI scenario, so that differing GI designs can be grouped and analyzed (and their analyses compared). In a subsequent milestone, we will add support for populating the system with data and models for new study areas.
Overdue by 9 year(s)•Due by July 15, 2016•3/3 issues closedPost Feb.-March Hackathon issues related to on-going CyberSEES work that needs to be address after the Sept. GI-Venture demo.
Overdue by 9 year(s)•Due by April 5, 2016•4/20 issues closed