| 1 | +Category,Dictonary_Name,Parameter Name,Parameter Description,amount,unit,uncertainty_type,loc,scale,shape,minimum,maximum,Reference,Comment |
| 2 | +AnF_operation,AnF_operation,ophrsperday,Daily operating hours,8,hours,,,,,,,, |
| 3 | +AnF_operation,AnF_operation,opdaysperyear,Annual operating days,260,days,,,,,,,, |
| 4 | +AnF_operation,AnF_operation,isDried,Dried Anima Feed? (0=no; 1=yes),0,0/1,,,,,,,, |
| 5 | +AnF_operation,AnF_operation,Dew_moist,Moisture content after dewatering,0.5,mass water/total mass,,,,,,,, |
| 6 | +AnF_operation,AnF_operation,Dried_moist,Moisture content after drying,0.25,mass water/total mass,,,,,,,, |
| 7 | +Loader,Loader,hpFEL,Front end loader use per facility capacity.,0.168,kW/Mgd,,,,,,,, |
| 8 | +Loader,Loader,mfFEL,Front end loader specific fuel consumption.,0.26,L/kWh,,,,,,,, |
| 9 | +Equipment:Conveyor,Eq_Conveyor,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 10 | +Equipment:Conveyor,Eq_Conveyor,Max_input,Max Throughput ,30,Mg/hr,,,,,,,, |
| 11 | +Equipment:Conveyor,Eq_Conveyor,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 12 | +Equipment:Conveyor,Eq_Conveyor,frac_motor,Fraction of Motor Rated Capacity Utilized,0.5,frac,,,,,,,, |
| 13 | +Equipment:Conveyor,Eq_Conveyor,motor,Motor Size,5.6,kW,,,,,,,, |
| 14 | +Equipment:Conveyor,Eq_Conveyor,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 15 | +Equipment:Conveyor,Eq_Conveyor,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 16 | +Equipment:Conveyor,Eq_Conveyor,Investment_cost,Investment Cost,46258,$,,,,,,,, |
| 17 | +Equipment:Conveyor,Eq_Conveyor,Installation_cost,Installation Cost,4625.8,$,,,,,,,, |
| 18 | +Equipment:Conveyor,Eq_Conveyor,O&M,Fixed Operations and Maintenance Cost,10000,$/yr,,,,,,,, |
| 19 | +Equipment:Conveyor,Eq_Conveyor,N_Labor,Number of Laborers Required ,0,person,,,,,,,, |
| 20 | +Equipment:Conveyor,Eq_Conveyor,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 21 | +Equipment:Conveyor,Eq_Conveyor,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 22 | +Equipment:Drum Feeder,Eq_DFeeder,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 23 | +Equipment:Drum Feeder,Eq_DFeeder,Max_input,Max Throughput ,30,Mg/hr,,,,,,,, |
| 24 | +Equipment:Drum Feeder,Eq_DFeeder,frac_MaxInput,Fraction of Max Throughput ,1,frac,,,,,,,, |
| 25 | +Equipment:Drum Feeder,Eq_DFeeder,frac_motor,Fraction of Motor Rated Capacity Utilized,0.5,frac,,,,,,,, |
| 26 | +Equipment:Drum Feeder,Eq_DFeeder,motor,Motor Size,15,kW,,,,,,,, |
| 27 | +Equipment:Drum Feeder,Eq_DFeeder,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 28 | +Equipment:Drum Feeder,Eq_DFeeder,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 29 | +Equipment:Drum Feeder,Eq_DFeeder,Investment_cost,Investment Cost,150000,$,,,,,,,, |
| 30 | +Equipment:Drum Feeder,Eq_DFeeder,Installation_cost,Installation Cost,15000,$,,,,,,,, |
| 31 | +Equipment:Drum Feeder,Eq_DFeeder,O&M,Fixed Operations and Maintenance Cost,100,$/yr,,,,,,,, |
| 32 | +Equipment:Drum Feeder,Eq_DFeeder,N_Labor,Number of Laborers Required ,1,person,,,,,,,, |
| 33 | +Equipment:Drum Feeder,Eq_DFeeder,N_Driver,Number of Drivers Required,1,person,,,,,,,, |
| 34 | +Equipment:Drum Feeder,Eq_DFeeder,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 35 | +Equipment:Disc Screen,Eq_DS,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 36 | +Equipment:Disc Screen,Eq_DS,Max_input,Max Throughput ,45,Mg/hr,,,,,,,, |
| 37 | +Equipment:Disc Screen,Eq_DS,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 38 | +Equipment:Disc Screen,Eq_DS,frac_motor,Fraction of Motor Rated Capacity Utilized,0.5,frac,,,,,,,, |
| 39 | +Equipment:Disc Screen,Eq_DS,motor,Motor Size,8.5,kW,,,,,,,, |
| 40 | +Equipment:Disc Screen,Eq_DS,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 41 | +Equipment:Disc Screen,Eq_DS,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 42 | +Equipment:Disc Screen,Eq_DS,Investment_cost,Investment Cost,175000,$,,,,,,,, |
| 43 | +Equipment:Disc Screen,Eq_DS,Installation_cost,Installation Cost,17500,$,,,,,,,, |
| 44 | +Equipment:Disc Screen,Eq_DS,O&M,Fixed Operations and Maintenance Cost,10000,$/yr,,,,,,,, |
| 45 | +Equipment:Disc Screen,Eq_DS,N_Labor,Number of Laborers Required ,1,person,,,,,,,, |
| 46 | +Equipment:Disc Screen,Eq_DS,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 47 | +Equipment:Disc Screen,Eq_DS,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 48 | +Equipment:Negative Sort,Eq_Neg_Sort,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 49 | +Equipment:Negative Sort,Eq_Neg_Sort,Max_input,Max Throughput ,30,Mg/hr,,,,,,,, |
| 50 | +Equipment:Negative Sort,Eq_Neg_Sort,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 51 | +Equipment:Negative Sort,Eq_Neg_Sort,frac_motor,Fraction of Motor Rated Capacity Utilized,0.5,frac,,,,,,,, |
| 52 | +Equipment:Negative Sort,Eq_Neg_Sort,motor,Motor Size,3,kW,,,,,,,, |
| 53 | +Equipment:Negative Sort,Eq_Neg_Sort,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 54 | +Equipment:Negative Sort,Eq_Neg_Sort,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 55 | +Equipment:Negative Sort,Eq_Neg_Sort,Investment_cost,Investment Cost,50000,$,,,,,,,, |
| 56 | +Equipment:Negative Sort,Eq_Neg_Sort,Installation_cost,Installation Cost,5000,$,,,,,,,, |
| 57 | +Equipment:Negative Sort,Eq_Neg_Sort,O&M,Fixed Operations and Maintenance Cost,0,$/yr,,,,,,,, |
| 58 | +Equipment:Negative Sort,Eq_Neg_Sort,N_Labor,Number of Laborers Required ,6,person,,,,,,,, |
| 59 | +Equipment:Negative Sort,Eq_Neg_Sort,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 60 | +Equipment:Negative Sort,Eq_Neg_Sort,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 61 | +Equipment:Shredder,Eq_Shred,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 62 | +Equipment:Shredder,Eq_Shred,Max_input,Max Throughput ,30,Mg/hr,,,,,,,, |
| 63 | +Equipment:Shredder,Eq_Shred,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 64 | +Equipment:Shredder,Eq_Shred,frac_motor,Fraction of Motor Rated Capacity Utilized,0.85,frac,,,,,,,, |
| 65 | +Equipment:Shredder,Eq_Shred,motor,Motor Size,320,kW,,,,,,,, |
| 66 | +Equipment:Shredder,Eq_Shred,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 67 | +Equipment:Shredder,Eq_Shred,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 68 | +Equipment:Shredder,Eq_Shred,Investment_cost,Investment Cost,150000,$,,,,,,,, |
| 69 | +Equipment:Shredder,Eq_Shred,Installation_cost,Installation Cost,15000,$,,,,,,,, |
| 70 | +Equipment:Shredder,Eq_Shred,O&M,Fixed Operations and Maintenance Cost,5000,$/yr,,,,,,,, |
| 71 | +Equipment:Shredder,Eq_Shred,N_Labor,Number of Laborers Required ,1,person,,,,,,,, |
| 72 | +Equipment:Shredder,Eq_Shred,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 73 | +Equipment:Shredder,Eq_Shred,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 74 | +Equipment:Pelletizer,Eq_Pellet,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 75 | +Equipment:Pelletizer,Eq_Pellet,Max_input,Max Throughput ,8,Mg/hr,,,,,,,, |
| 76 | +Equipment:Pelletizer,Eq_Pellet,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 77 | +Equipment:Pelletizer,Eq_Pellet,frac_motor,Fraction of Motor Rated Capacity Utilized,0.85,frac,,,,,,,, |
| 78 | +Equipment:Pelletizer,Eq_Pellet,motor,Motor Size,60,kW,,,,,,,,6 pelletizers@ 200 hp |
| 79 | +Equipment:Pelletizer,Eq_Pellet,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 80 | +Equipment:Pelletizer,Eq_Pellet,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 81 | +Equipment:Pelletizer,Eq_Pellet,Investment_cost,Investment Cost,30000,$,,,,,,,, |
| 82 | +Equipment:Pelletizer,Eq_Pellet,Installation_cost,Installation Cost,2500,$,,,,,,,, |
| 83 | +Equipment:Pelletizer,Eq_Pellet,O&M,Fixed Operations and Maintenance Cost,5000,$/yr,,,,,,,, |
| 84 | +Equipment:Pelletizer,Eq_Pellet,N_Labor,Number of Laborers Required ,0,person,,,,,,,, |
| 85 | +Equipment:Pelletizer,Eq_Pellet,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 86 | +Equipment:Pelletizer,Eq_Pellet,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 87 | +Equipment:Sterilizer,Eq_Sterilizer,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 88 | +Equipment:Sterilizer,Eq_Sterilizer,Max_input,Max Throughput ,10,Mg/hr,,,,,,,, |
| 89 | +Equipment:Sterilizer,Eq_Sterilizer,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 90 | +Equipment:Sterilizer,Eq_Sterilizer,frac_motor,Fraction of Motor Rated Capacity Utilized,0.85,frac,,,,,,,, |
| 91 | +Equipment:Sterilizer,Eq_Sterilizer,motor,Motor Size,4,kW,,,,,,,, |
| 92 | +Equipment:Sterilizer,Eq_Sterilizer,diesel_use,Diesel Consumption ,4.5,L/Mg,,,,,,,, |
| 93 | +Equipment:Sterilizer,Eq_Sterilizer,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 94 | +Equipment:Sterilizer,Eq_Sterilizer,Investment_cost,Investment Cost,60000,$,,,,,,,, |
| 95 | +Equipment:Sterilizer,Eq_Sterilizer,Installation_cost,Installation Cost,6000,$,,,,,,,, |
| 96 | +Equipment:Sterilizer,Eq_Sterilizer,O&M,Fixed Operations and Maintenance Cost,5000,$/yr,,,,,,,, |
| 97 | +Equipment:Sterilizer,Eq_Sterilizer,N_Labor,Number of Laborers Required ,0,person,,,,,,,, |
| 98 | +Equipment:Sterilizer,Eq_Sterilizer,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 99 | +Equipment:Sterilizer,Eq_Sterilizer,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 100 | +Equipment:Dewater,Eq_Dewater,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 101 | +Equipment:Dewater,Eq_Dewater,Max_input,Max Throughput ,25,Mg/hr,,,,,,,, |
| 102 | +Equipment:Dewater,Eq_Dewater,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 103 | +Equipment:Dewater,Eq_Dewater,frac_motor,Fraction of Motor Rated Capacity Utilized,0.85,frac,,,,,,,, |
| 104 | +Equipment:Dewater,Eq_Dewater,motor,Motor Size,7,kW,,,,,,,, |
| 105 | +Equipment:Dewater,Eq_Dewater,diesel_use,Diesel Consumption ,0,L/Mg,,,,,,,, |
| 106 | +Equipment:Dewater,Eq_Dewater,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 107 | +Equipment:Dewater,Eq_Dewater,Investment_cost,Investment Cost,40000,$,,,,,,,, |
| 108 | +Equipment:Dewater,Eq_Dewater,Installation_cost,Installation Cost,4000,$,,,,,,,, |
| 109 | +Equipment:Dewater,Eq_Dewater,O&M,Fixed Operations and Maintenance Cost,5000,$/yr,,,,,,,, |
| 110 | +Equipment:Dewater,Eq_Dewater,N_Labor,Number of Laborers Required ,0,person,,,,,,,, |
| 111 | +Equipment:Dewater,Eq_Dewater,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 112 | +Equipment:Dewater,Eq_Dewater,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 113 | +Equipment:Dryer,Eq_Dryer,Calc_base,Mass Used in Resource Calculations,2,0/1/2 (Removed/Remaining/TotalThroughput),,,,,,,, |
| 114 | +Equipment:Dryer,Eq_Dryer,Max_input,Max Throughput ,12,Mg/hr,,,,,,,, |
| 115 | +Equipment:Dryer,Eq_Dryer,frac_MaxInput,Fraction of Max Throughput ,0.85,frac,,,,,,,, |
| 116 | +Equipment:Dryer,Eq_Dryer,frac_motor,Fraction of Motor Rated Capacity Utilized,0.85,frac,,,,,,,, |
| 117 | +Equipment:Dryer,Eq_Dryer,motor,Motor Size,100,kW,,,,,,,, |
| 118 | +Equipment:Dryer,Eq_Dryer,diesel_use,Diesel Consumption ,24,L/Mg,,,,,,,,Assuming that input mositure is 50% & output moisture is 20% |
| 119 | +Equipment:Dryer,Eq_Dryer,LPG_use,LPG Consumption,0,m3/Mg,,,,,,,, |
| 120 | +Equipment:Dryer,Eq_Dryer,Investment_cost,Investment Cost,350000,$,,,,,,,, |
| 121 | +Equipment:Dryer,Eq_Dryer,Installation_cost,Installation Cost,35000,$,,,,,,,, |
| 122 | +Equipment:Dryer,Eq_Dryer,O&M,Fixed Operations and Maintenance Cost,10000,$/yr,,,,,,,, |
| 123 | +Equipment:Dryer,Eq_Dryer,N_Labor,Number of Laborers Required ,0,person,,,,,,,, |
| 124 | +Equipment:Dryer,Eq_Dryer,N_Driver,Number of Drivers Required,0,person,,,,,,,, |
| 125 | +Equipment:Dryer,Eq_Dryer,LifeTime,Economic Lifetime,10,yr,,,,,,,, |
| 126 | +Wastewater ,Wastewater ,BOD_conc,Concentration of BOD in wastewater,75,gr/L,,,,,,,[13], |
| 127 | +Wastewater ,Wastewater ,BOD_elec,sludge generated per BOD removed,1.00107,kWh / kg BOD removed,,,,,,,, |
| 128 | +Wastewater ,Wastewater ,BOD_CO2,Mass CO2 generated per mass BOD removed,3.6,kg CO2 / kg BOD,,,,,,,, |
| 129 | +Electricity,Electricity,Area_rate,Indoor Floor Area Rate,24.38,m2/tpd,,,,,,,, |
| 130 | +Electricity,Electricity,Frac_office,Percent Office Floor Area,0.04,frac of total m2,,,,,,,, |
| 131 | +Electricity,Electricity,Elec_office,Electricity Consumed in Offices,0.51,kWh/m2-day,,,,,,,, |
| 132 | +Electricity,Electricity,Elec_floor,Electricity Consumed on floor,0.02,kWh/m2-day,,,,,,,, |
| 133 | +Economic_parameters,Economic_parameters,lifetime,Facility useful life,20,years,,,,,,,, |
| 134 | +Economic_parameters,Economic_parameters,Inerest_rate,Annual Interest Rate,0.035,-,,,,,,,, |
| 135 | +Labor,Labor,Hr_shift,Paid Hours in Shift,9,hrs/shift,,,,,,,, |
| 136 | +Labor,Labor,Shift_day,Number of Shifts Per Workday,2,shift/day,,,,,,,, |
| 137 | +Labor,Labor,Day_year,Days Operating Per Year,260,days/year,,,,,,,, |
| 138 | +Labor,Labor,Fringe_rate,Fringe Rate,0.3333,% of Pay Rate,,,,,,,, |
| 139 | +Labor,Labor,Management_rate,Labor Management Rate,0.5,% of Labor,,,,,,,, |
| 140 | +Labor,Labor,Labor_rate,Labor Pay Rate,10,$/Sorter-hr,,,,,,,, |
| 141 | +Labor,Labor,Driver_rate,Driver Pay Rate,12,$/Driver-hr,,,,,,,, |
| 142 | +Contruction Cost,Constr_cost,Inerest_rate,Annual Interest Rate,0.035,-,,,,,,,, |
| 143 | +Contruction Cost,Constr_cost,Grading_rate,Grading cost per acre,31400,$/ha,,,,,,,, |
| 144 | +Contruction Cost,Constr_cost,Paving_rate,Paving cost,123000,$/ha,,,,,,,, |
| 145 | +Contruction Cost,Constr_cost,Inerest_rate,Annual Interest Rate,0.035,-,,,,,,,, |
| 146 | +Contruction Cost,Constr_cost,lifetime,Life of Structure,20,yrs,,,,,,,, |
| 147 | +Contruction Cost,Constr_cost,Constr_rate,Construction Cost Rate,97.7,$/ft2,,,,,,,, |
| 148 | +Contruction Cost,Constr_cost,Eng_rate,Engineering Rate,0.32,% of const cost,,,,,,,, |
| 149 | +Contruction Cost,Constr_cost,Land_rate,Land Cost,10000,$/acre,,,,,,,, |
| 150 | +Contruction Cost,Constr_cost,Land_req_factor,Land Requirement Factor,3,-,,,,,,,, |
| 151 | +Contruction Cost,Constr_cost,Fencing_Rate,Fencing,56,$/m,,,,,,,, |
| 152 | +Contruction Cost,Constr_cost,Landscaping_rate,Landscaping,10000,$/ha,,,,,,,, |