Lines changed: 13 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,13 @@
1+
Parameter Name,Parameter Description,Unit,Typical,Best Case,Worst Case,California
2+
initColTime,Time until initial gas collection,years,2,0.5,5,1
3+
initColEff,Initial gas collection efficiency,%,50,50,50,50
4+
cellFillTime,Cell fill time,years,5,3,5,2
5+
intColEff,Gas collection efficiency under intermediate cover,%,75,75,75,80
6+
incColTime,Time to increased gas collection efficiency,years,15,15,15,8
7+
incColEff,Increased gas collection efficiency,%,82.5,82.5,82.5,85
8+
timeToFinCover,Time from final waste placement to final cover,years,1,1,1,1
9+
finColEff,Gas collection efficiency under final cover,%,90,90,90,90
10+
enrgOn,Energy recovery cuton time,years,,,,
11+
enrgOff,Energy recovery cutoff time,years,,,,
12+
flareOn,Flare cuton time,Years,,,,
13+
flareOff,Flare cutoff time,Years,,,,

swolfpy_inputdata/Data/LF_Input.csv

Lines changed: 27 additions & 126 deletions
Original file line numberDiff line numberDiff line change
@@ -3,32 +3,36 @@ Energy Recovery Costs,Eng_rec_cost,capital,Capital Cost,1400,$/kW,,,,,,,[2],
33
Energy Recovery Costs,Eng_rec_cost,O&M,O&M Cost,130,$/MW,,,,,,,[2],
44
Energy Recovery Costs,Eng_rec_cost,Life,Life of Engine,20,years,,,,,,,[2],
55
Energy Recovery Costs,Eng_rec_cost,engineCap,Engine capacity per Mgpd,5,kW/Mgpd,,,,,,,[2],
6-
Landfill Gas Parameters,LF_gas,actk,Landfill decay rate,0.04,1/yr,,,,,,,[2],
7-
Landfill Gas Parameters,LF_gas,initColTime,Time until initial gas collection,2,years,,,,,,,[2],
8-
Landfill Gas Parameters,LF_gas,initColEff,Initial gas collection efficiency,50,%,,,,,,,[2],
9-
Landfill Gas Parameters,LF_gas,cellFillTime,Cell fill time,5,years,,,,,,,[2],
10-
Landfill Gas Parameters,LF_gas,intColEff,Gas collection efficiency under intermediate cover,75,%,,,,,,,[2],
11-
Landfill Gas Parameters,LF_gas,incColTime,Time to increased gas collection efficiency,15,years,,,,,,,[2],
12-
Landfill Gas Parameters,LF_gas,incColEff,Increased gas collection efficiency,82.5,%,,,,,,,[2],
13-
Landfill Gas Parameters,LF_gas,timeToFinCover,Time from final waste placement to final cover,1,years,,,,,,,[2],
14-
Landfill Gas Parameters,LF_gas,finColEff,Gas collection efficiency under final cover,90,%,,,,,,,[2],
15-
Landfill Gas Parameters,LF_gas,enrgOn,Energy recovery cuton time,5,years,,,,,,,[2],
16-
Landfill Gas Parameters,LF_gas,enrgOff1,Energy recovery cutoff time,52,years,,,,,,,[2],
17-
Landfill Gas Parameters,LF_gas,flareOff,Flare cutoff time,50,Years,,,,,,,[2],
18-
Landfill Gas Parameters,LF_gas,enrgRecovered,Recover energy ,1,None,,,,,,,[2],
19-
Landfill Gas Parameters,LF_gas,EnrgRecDownTime,Energy recovery downtime ,3,%,,,,,,,[2],
20-
Landfill Gas Parameters,LF_gas,FlareCombEff,Flare methane destruction efficiency,99.9,%,,,,,,,[2],
21-
Landfill Gas Parameters,LF_gas,EngineCombEff,Energy recovery destruction efficiency,99,%,,,,,,,[2],
22-
Landfill Gas Parameters,LF_gas,blwrPRR,Blower power rating requirement,60.85,scfm/hp,,,,,,,[2],
23-
Landfill Gas Parameters,LF_gas,blwrPRRm3,Blower power rating requirement,1215470.3,m3/yr/kW,,,,,,,[2],
24-
Landfill Gas Parameters,LF_gas,blwrPerLoad,Blower load,75,%,,,,,,,[2],
25-
Landfill Gas Parameters,LF_gas,blwrEff,Blower efficiency,90,kW-out/kWh-in,,,,,,,[2],
26-
Landfill Gas Parameters,LF_gas,optime,Landfill Operation time,20,years,,,,,,,[2],
27-
Landfill Gas Parameters,LF_gas,ch4prop,CH4 fraction in Biogas,0.5,fraction,,,,,,,[2],
6+
Landfill operation parameteres,LF_Op,annWaste,Annual waste acceptance rate,233091,Mg/year,,,,,,,Wendy,stDev=276465
7+
Landfill operation parameteres,LF_Op,optime,Landfill Operation time,80,years,,,,,,,Wendy,stDev=66
8+
Landfill Gas Parameters,LFG_param,actk,Landfill decay rate,0.04,1/yr,,,,,,,[2],
9+
Landfill Gas Parameters,LFG_param,base_L0,Base L0 (Methane yield),100,m3 CH4/Mg,,,,,,,,
10+
Landfill Gas Parameters,LFG_param,ch4prop,CH4 fraction in Biogas,0.5,fraction,,,,,,,[2],
11+
Landfill Gas Parameters,LFG_param,LFG_col_plan,Gas collection scenario,0,"(0: Typical, 1: Best, 2:Worst, 3:California)",,,,,,,,
12+
Energy_Rec,Energy_Rec,enrgRecovered,Recover energy ,1,0/1,,,,,,,[2],
13+
Energy_Rec,Energy_Rec,MinFowRec,Min LFG flow for energy recovery,350,cfm,,,,,,,,
14+
Energy_Rec,Energy_Rec,MinYrRec,Min energy recovery operation time,5,years,,,,,,,,
15+
Energy_Rec,Energy_Rec,RecInstallTime,Time to install energy recovery system,1,years,,,,,,,,
16+
Energy_Rec,Energy_Rec,EnrgRecDownTime,Energy recovery downtime ,3,%,,,,,,,[2],
17+
Energy_Rec,Energy_Rec,EngineCombEff,Energy recovery destruction efficiency,99,%,,,,,,,[2],
18+
Energy_Rec,Energy_Rec,convEff,combustion eff,0.365,None,,,,,,,[2],
19+
Flare,Flare,NMOC_Conc,Mandated NMOC cuton concentration,4000,ppmv,,,,,,,,
20+
Flare,Flare,NMOC_Conc_actual,Actual NMOC concentration for cutoff,595,ppmv,,,,,,,,
21+
Flare,Flare,NMOC_MW,NMOC molecular weight,86.18,g/mol,,,,,,,,
22+
Flare,Flare,NMOC_Cufoff,NMOC cutoff,34,Mg/yr,,,,,,,,
23+
Flare,Flare,Temp,Temperature to revise concentration,20,C,,,,,,,,
24+
Flare,Flare,MinYr,Flare min time on,15,years,,,,,,,,
25+
Flare,Flare,TimeReq,Number of years flare must operate after operations cease,15,years,,,,,,,,
26+
Flare,Flare,Flow_cutoff,Flare runs until below gas flow rate,0,0/1,,,,,,,,
27+
Flare,Flare,Flow_req,Minimum allowable gas flow rate ,350,cfm,,,,,,,,
28+
Flare,Flare,FlareCombEff,Flare methane destruction efficiency,99.9,%,,,,,,,[2],
29+
LFG Parameters,LF_gas,blwrPRR,Blower power rating requirement,60.85,scfm/hp,,,,,,,[2],
30+
LFG Parameters,LF_gas,blwrPRRm3,Blower power rating requirement,1215470.3,m3/yr/kW,,,,,,,[2],
31+
LFG Parameters,LF_gas,blwrPerLoad,Blower load,75,%,,,,,,,[2],
32+
LFG Parameters,LF_gas,blwrEff,Blower efficiency,90,kW-out/kWh-in,,,,,,,[2],
2833
Oxidation Inputs,Ox,ox_nocol,Oxidation rate without collection,10,%,,,,,,,[2],
2934
Oxidation Inputs,Ox,ox_col,Oxidation rate with collection,20,%,,,,,,,[2],
3035
Oxidation Inputs,Ox,ox_fincov,Oxidation rate after final cover,35,%,,,,,,,[2],
31-
LFG combustion,LFG_Comb,convEff,combustion eff,0.365,None,,,,,,,[2],
3236
Leachate,Leachate,dis_POTW,Distance to POTW,40,km,,,,,,,[2],
3337
Leachate,Leachate,pay_leach,Actual payload of trucks delivering leachate,35,Mg,,,,,,,[2],
3438
Leachate,Leachate,er_leach,Empty return of trucks delivering leachate,1,None,,,,,,,[2],
@@ -68,65 +72,6 @@ LEACHATE PUMPING,lcht_pump,leachAirPerLeach,Volume of free air required per volu
6872
LEACHATE PUMPING,lcht_pump,leachCompPowReq,Compressor power requirements,4,cfm/hp,,,,,,,[2],
6973
LEACHATE PUMPING,lcht_pump,leachCompLoad,Compressor load percent,75,%,,,,,,,[2],
7074
LEACHATE PUMPING,lcht_pump,leachEff,Compressor motor efficiency,90,%,,,,,,,[2],
71-
WASTE AND MATERIAL DENSITY,density,LF_d_msw,Compacted waste ,890,kg /m3,,,,,,,[2],
72-
WASTE AND MATERIAL DENSITY,density,LF_d_soil,Soil and clay,1840,kg /m3,,,,,,,[2],
73-
WASTE AND MATERIAL DENSITY,density,LF_d_HPDE,HDPE ,954,kg /m3,,,,,,,[2],
74-
WASTE AND MATERIAL DENSITY,density,LF_d_revgen,Revenue generating cover,1840,kg /m3,,,,,,,[2],
75-
WASTE AND MATERIAL DENSITY,density,LF_d_fuel,Diesel fuel ,0.84,kg/L,,,,,,,[2],
76-
WASTE AND MATERIAL DENSITY,density,LF_d_gtx,Geotextiles,94.5,kg /m3,,,,,,,[2],
77-
WASTE AND MATERIAL DENSITY,density,LF_d_sand,Sand,1560,kg /m3,,,,,,,[2],
78-
WASTE AND MATERIAL DENSITY,density,LF_d_PVC,PVC,1350,kg /m3,,,,,,,[2],
79-
WASTE AND MATERIAL DENSITY,density,LF_d_crt,Concrete,2370,kg /m3,,,,,,,[2],
80-
Daily cover,Daily_cover,LF_p_HDPE1,Percent HDPE,15,%,,,,,,,[2],
81-
Daily cover,Daily_cover,LF_p_revgen,Percent revenue generating cover,15,%,,,,,,,[2],
82-
Daily cover,Daily_cover,LF_p_ncvr,Percent no daily cover,0,%,,,,,,,[2],
83-
Daily cover,Daily_cover,LF_p_cvr1,Percent volume used by daily cover,10,%,,,,,,,[2],
84-
Daily cover,Daily_cover,LF_t_HDPE,HDPE thickness ,0.38,mm,,,,,,,[2],
85-
Daily cover,Daily_cover,LF_a_HDPE,Area of HDPE ,1000,m2/ha,,,,,,,[2],
86-
Daily cover,Daily_cover,LF_fuel1,Total fuel use at a site with daily cover,1.1679,L/Mg,,,,,,,[2],
87-
Daily cover,Daily_cover,LF_fuel2,Fuel use at a site with no daily cover,0.7925,L/Mg,,,,,,,[2],
88-
Daily cover,Daily_cover,LF_hd1,HAUL DISTANCE_Fuel,80,km,,,,,,,[2],
89-
Daily cover,Daily_cover,LF_hd2,HAUL DISTANCE_Soil ,16,km,,,,,,,[2],
90-
Daily cover,Daily_cover,LF_hd3,HAUL DISTANCE_HDPE ,400,km,,,,,,,[2],
91-
Daily cover,Daily_cover,LF_er1,EMPTY RETURN_fuel,1,None,,,,,,,[2],
92-
Daily cover,Daily_cover,LF_er2,EMPTY RETURN_soil ,1,None,,,,,,,[2],
93-
Daily cover,Daily_cover,LF_er3,EMPTY RETURN_HDPE ,1,None,,,,,,,[2],
94-
Daily cover,Daily_cover,actpay_fuel,Actual payload of heavy duty fuel trucks,35,Mg,,,,,,,[2],
95-
Daily cover,Daily_cover,actpay_hdpe,Actual payload of heavy duty trucks hauling HDPE,35,Mg,,,,,,,[2],
96-
Daily cover,Daily_cover,actpay_soil,Actual payload of medium duty trucks hauling soil,24,Mg,,,,,,,[2],
97-
Final cover _ Closure,Final_cover,LF_t_soil,Thickness of soil layer,0.15,m,,,,,,,[2],
98-
Final cover _ Closure,Final_cover,LF_t_gtx,Thickness of geotextile layer,1.5,mm,,,,,,,[2],
99-
Final cover _ Closure,Final_cover,LF_t_sand1,Thickness of first sand layer,0.3,m,,,,,,,[2],
100-
Final cover _ Closure,Final_cover,LF_t_HDPE2,Thickness of HDPE layer,1.5,mm,,,,,,,[2],
101-
Final cover _ Closure,Final_cover,LF_t_clay,Thickness of clay layer,0.6,m,,,,,,,[2],
102-
Final cover _ Closure,Final_cover,LF_t_sand2,Thickness of second sand layer,0,m,,,,,,,[2],
103-
Final cover _ Closure,Final_cover,LF_fuel8,FUEL USE DURING CLOSURE,0.06673712,L / Mg MSW,,,,,,,[2],
104-
Final cover _ Closure,Final_cover,LF_hd5,Clay and soil,8,km,,,,,,,[2],
105-
Final cover _ Closure,Final_cover,LF_hd6,Sand,32,km,,,,,,,[2],
106-
Final cover _ Closure,Final_cover,LF_hd7,Geotextiles,400,km,,,,,,,[2],
107-
Final cover _ Closure,Final_cover,LF_hd8,HDPE (Final Cover),400,km,,,,,,,[2],
108-
Final cover _ Closure,Final_cover,LF_hd9,HDPE (Non Final Cover),400,km,,,,,,,[2],
109-
Final cover _ Closure,Final_cover,LF_hd10,Fuel,80,km,,,,,,,[2],
110-
Final cover _ Closure,Final_cover,LF_hd11,PVC,400,km,,,,,,,[2],
111-
Final cover _ Closure,Final_cover,Heavy_er,Heavy duty truck empty return,1,None,,,,,,,[2],
112-
Final cover _ Closure,Final_cover,Medium_er,Medium truck empty return,1,None,,,,,,,[2],
113-
Final cover _ Closure,Final_cover,actpay_heavy,Heavy duty truck actual load,35,Mg,,,,,,,[2],
114-
Final cover _ Closure,Final_cover,actpay_medium,Medium duty truck actual load,24,Mg,,,,,,,[2],
115-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_d_wells,Density of gas collection wells,2.5,wells/ha,,,,,,,[2],
116-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_d_HDPE,Linear density of HDPE pipe,4.7,kg/m,,,,,,,[2],
117-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_d_PVC,Linear density of PVC pipe,3,kg/m,,,,,,,[2],
118-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_l_wells,Average length of vertical wells,13,m,,,,,,,[2],
119-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_l_HDPE,Length of additional HDPE connection,30,m,,,,,,,[2],
120-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_HDPE,Amount HDPE,0.008,kg / Mg MSW,,,,,,,[2],
121-
Gas Collection Pipe system,Gas_Coll_pipe,LF_gc_PVC,Amount PVC,0.00405,kg / Mg MSW,,,,,,,[2],
122-
Post closure,post_closure,LF_n_pc,Post closure period,30,years,,,,,,,[2],
123-
Post closure,post_closure,LF_p_cvr,Percent of final cover replaced,10,%,,,,,,,[2],
124-
Post closure,post_closure,LF_fuel_12,Amount of fuel used per year for inspection,1.67E-05,L / year - Mg MSW,,,,,,,[2],
125-
Post closure,post_closure,LF_fuel_13,Amount of fuel used per year for mowing,3.84E-06,L / year - Mg MSW,,,,,,,[2],
126-
Post closure,post_closure,Heavy_er,Heavy duty truck empty return,1,None,,,,,,,[2],
127-
Post closure,post_closure,Medium_er,Medium truck empty return,1,None,,,,,,,[2],
128-
Post closure,post_closure,actpay_heavy,Heavy duty truck actual load,35,Mg,,,,,,,[2],
129-
Post closure,post_closure,actpay_medium,Medium duty truck actual load,24,Mg,,,,,,,[2],
13075
LF,LF,LF_Rlw,Landfill length/width ratio,1,,,,,,,,[2],The default value is chosen based on engineering judgment to minimize land requirements.
13176
LF,LF,LF_Lb,Buffer zone,90,m,,,,,,,"RCRA Subtitle D, 40 CFR Part 258. Environmental Protection Agency, October 9, 1991",This default value is chosen based on federal regulations.
13277
LF,LF,LF_f3,Fraction of buffer zone cleared/landscaped,0.05,fraction,,,,,,,[2],
@@ -235,47 +180,3 @@ LF,LF,dies_sand,Sand excavation diesel use,1.4,L/Mg,,,,,,,[2],
235180
LF,LF,offArea,Office area,56,m2,,,,,,,[2],
236181
LF,LF,offElecReq,Office area electricity use,256,kWh/m2-yr,,,,,,,[2],
237182
LF,LF,storElecReq,Equipment storage and maintence electricity use,82,kWh/m2-yr,,,,,,,[2],
238-
Operational_Cost,Operational_Cost,Yard_Trimmings_Leaves,Operation cost of Yard_Trimmings_Leaves,16.49,$/Mg,,,,,,,[2],
239-
Operational_Cost,Operational_Cost,Yard_Trimmings_Grass,Operation cost of Yard_Trimmings_Grass,16.03,$/Mg,,,,,,,[2],
240-
Operational_Cost,Operational_Cost,Yard_Trimmings_Branches,Operation cost of Yard_Trimmings_Branches,18.32,$/Mg,,,,,,,[2],
241-
Operational_Cost,Operational_Cost,Food_Waste_Vegetable,Operation cost of Food_Waste_Vegetable,20.39,$/Mg,,,,,,,[2],
242-
Operational_Cost,Operational_Cost,Food_Waste_Non_Vegetable,Operation cost of Food_Waste_Non_Vegetable,26.83,$/Mg,,,,,,,[2],
243-
Operational_Cost,Operational_Cost,Wood,Operation cost of Wood,14.02,$/Mg,,,,,,,[2],
244-
Operational_Cost,Operational_Cost,Wood_Other,Operation cost of Wood_Other,13.95,$/Mg,,,,,,,[2],
245-
Operational_Cost,Operational_Cost,Textiles,Operation cost of Textiles,20.05,$/Mg,,,,,,,[2],
246-
Operational_Cost,Operational_Cost,Rubber_Leather,Operation cost of Rubber_Leather,12.95,$/Mg,,,,,,,[2],
247-
Operational_Cost,Operational_Cost,Newsprint,Operation cost of Newsprint,18.62,$/Mg,,,,,,,[2],
248-
Operational_Cost,Operational_Cost,Corr_Cardboard,Operation cost of Corr_Cardboard,27.23,$/Mg,,,,,,,[2],
249-
Operational_Cost,Operational_Cost,Office_Paper,Operation cost of Office_Paper,34.04,$/Mg,,,,,,,[2],
250-
Operational_Cost,Operational_Cost,Magazines,Operation cost of Magazines,19.89,$/Mg,,,,,,,[2],
251-
Operational_Cost,Operational_Cost,Third_Class_Mail,Operation cost of Third_Class_Mail,19.58,$/Mg,,,,,,,[2],
252-
Operational_Cost,Operational_Cost,Folding_Containers,Operation cost of Folding_Containers,23.8,$/Mg,,,,,,,[2],
253-
Operational_Cost,Operational_Cost,Paper_Bags,Operation cost of Paper_Bags,26.04,$/Mg,,,,,,,[2],
254-
Operational_Cost,Operational_Cost,Mixed_Paper,Operation cost of Mixed_Paper,23.83,$/Mg,,,,,,,[2],
255-
Operational_Cost,Operational_Cost,Paper_Non_recyclable,Operation cost of Paper_Non_recyclable,22.72,$/Mg,,,,,,,[2],
256-
Operational_Cost,Operational_Cost,HDPE_Translucent_Containers,Operation cost of HDPE_Translucent_Containers,12.95,$/Mg,,,,,,,[2],
257-
Operational_Cost,Operational_Cost,HDPE_Pigmented_Containers,Operation cost of HDPE_Pigmented_Containers,12.95,$/Mg,,,,,,,[2],
258-
Operational_Cost,Operational_Cost,PET_Containers,Operation cost of PET_Containers,12.95,$/Mg,,,,,,,[2],
259-
Operational_Cost,Operational_Cost,Plastic_Other_1_Polypropylene,Operation cost of Plastic_Other_1_Polypropylene,12.95,$/Mg,,,,,,,[2],
260-
Operational_Cost,Operational_Cost,Plastic_Other_2,Operation cost of Plastic_Other_2,12.95,$/Mg,,,,,,,[2],
261-
Operational_Cost,Operational_Cost,Mixed_Plastic,Operation cost of Mixed_Plastic,12.95,$/Mg,,,,,,,[2],
262-
Operational_Cost,Operational_Cost,Plastic_Film,Operation cost of Plastic_Film,12.95,$/Mg,,,,,,,[2],
263-
Operational_Cost,Operational_Cost,Plastic_Non_Recyclable,Operation cost of Plastic_Non_Recyclable,12.95,$/Mg,,,,,,,[2],
264-
Operational_Cost,Operational_Cost,Ferrous_Cans,Operation cost of Ferrous_Cans,12.95,$/Mg,,,,,,,[2],
265-
Operational_Cost,Operational_Cost,Ferrous_Metal_Other,Operation cost of Ferrous_Metal_Other,12.95,$/Mg,,,,,,,[2],
266-
Operational_Cost,Operational_Cost,Aluminum_Cans,Operation cost of Aluminum_Cans,12.95,$/Mg,,,,,,,[2],
267-
Operational_Cost,Operational_Cost,Aluminum_Foil,Operation cost of Aluminum_Foil,12.95,$/Mg,,,,,,,[2],
268-
Operational_Cost,Operational_Cost,Aluminum_Other,Operation cost of Aluminum_Other,12.95,$/Mg,,,,,,,[2],
269-
Operational_Cost,Operational_Cost,Ferrous_Non_recyclable,Operation cost of Ferrous_Non_recyclable,12.95,$/Mg,,,,,,,[2],
270-
Operational_Cost,Operational_Cost,Al_Non_recyclable,Operation cost of Al_Non_recyclable,12.95,$/Mg,,,,,,,[2],
271-
Operational_Cost,Operational_Cost,Glass_Brown,Operation cost of Glass_Brown,12.95,$/Mg,,,,,,,[2],
272-
Operational_Cost,Operational_Cost,Glass_Green,Operation cost of Glass_Green,12.95,$/Mg,,,,,,,[2],
273-
Operational_Cost,Operational_Cost,Glass_Clear,Operation cost of Glass_Clear,12.95,$/Mg,,,,,,,[2],
274-
Operational_Cost,Operational_Cost,Mixed_Glass,Operation cost of Mixed_Glass,12.95,$/Mg,,,,,,,[2],
275-
Operational_Cost,Operational_Cost,Glass_Non_recyclable,Operation cost of Glass_Non_recyclable,12.95,$/Mg,,,,,,,[2],
276-
Operational_Cost,Operational_Cost,Misc_Organic,Operation cost of Misc_Organic,23.68,$/Mg,,,,,,,[2],
277-
Operational_Cost,Operational_Cost,Misc_Inorganic,Operation cost of Misc_Inorganic,12.95,$/Mg,,,,,,,[2],
278-
Operational_Cost,Operational_Cost,E_waste,Operation cost of E_waste,12.95,$/Mg,,,,,,,[2],
279-
Operational_Cost,Operational_Cost,Bottom_Ash,Operation cost of Bottom_Ash,12.95,$/Mg,,,,,,,[2],
280-
Operational_Cost,Operational_Cost,Fly_Ash,Operation cost of Fly_Ash,12.95,$/Mg,,,,,,,[2],
281-
Operational_Cost,Operational_Cost,Diapers_and_sanitary_products,Operation cost of Diapers_and_sanitary_products,32.39,$/Mg,,,,,,,[2],

swolfpy_inputdata/LF_Input.py

Lines changed: 2 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -34,3 +34,5 @@ def __init__(self, input_data_path=None, process_name='LF', CommonDataObjct=None
3434

3535
self.lcht_Alloc = pd.read_csv(Path(__file__).parent / 'Data/LF_Leachate_Allocation.csv',
3636
index_col=0).loc[CommonDataObjct.Index]
37+
38+
self.GasColPlan = pd.read_csv(Path(__file__).parent / 'Data/LF_GasColPlan.csv', index_col=0)

0 commit comments

Comments
 (0)