Skip to content

Commit c10fdbd

Browse files
Roller Coaster
1 parent 124c12b commit c10fdbd

File tree

1 file changed

+29
-3
lines changed

1 file changed

+29
-3
lines changed

puzzles/python3/roller-coaster/README.md

Lines changed: 29 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -2,7 +2,7 @@
22

33
You have been appointed to oversee and analyze the operations of a newly established amusement park. Your primary task is to predict the daily earnings for the park's roller coaster attraction. To do this, you must understand the rules and dynamics of how visitors queue for and ride the roller coaster.
44

5-
### Rules and Operation
5+
## Rules and Operation
66

77
1. **Attraction Popularity:** The roller coaster is immensely popular, with visitors eager to experience multiple rides consecutively.
88

@@ -18,7 +18,7 @@ You have been appointed to oversee and analyze the operations of a newly establi
1818

1919
7. **Ticket Price:** Each individual visitor pays 1 dirham per ride.
2020

21-
### Attraction Earnings Calculation Example:
21+
## Attraction Earnings Calculation Example:
2222
Let's consider an example with L=3, C=3, and 4 groups in the queue (N=4) with the following group sizes: [3, 1, 1, 2].
2323

2424
- **Ride 1:** On the first roller coaster ride, only the first group (size 3) can get on and fills all available seats. After the ride, this group returns to the back of the queue, which now looks like this: [1, 1, 2, 3]. Earnings from the ride: 3 dirhams.
@@ -29,7 +29,7 @@ Let's consider an example with L=3, C=3, and 4 groups in the queue (N=4) with th
2929

3030
**Total Earnings:** The total earnings for the day are the sum of the earnings from each ride: 3 + 2 + 2 = 7 dirhams.
3131

32-
### Your Task
32+
## Your Task
3333
Your mission is to develop a system that can estimate the daily earnings for the roller coaster attraction, given the values of L, C, and the queue sizes (N) for each group. You need to account for the rules and dynamics described to determine the total earnings for the day.
3434

3535
**Input:**
@@ -42,3 +42,29 @@ Your mission is to develop a system that can estimate the daily earnings for the
4242
- The total earnings for the day, calculated based on the rules described.
4343

4444
Solve this problem to help the amusement park plan its daily operations and revenue projections for the roller coaster attraction.
45+
46+
## General Tips
47+
48+
To efficiently solve this problem, you can follow these steps:
49+
50+
1. **Queue Management:**
51+
- Maintain a data structure to represent the queue of groups waiting for the roller coaster.
52+
- A queue data structure, such as a linked list or array, would be suitable for this purpose.
53+
- Ensure that the queue preserves the order of groups and allows for efficient insertion and removal of elements.
54+
55+
2. **Simulation of Roller Coaster Rides:**
56+
- Simulate each ride of the roller coaster according to the given rules.
57+
- Track the number of available seats on each ride and fill them with groups from the queue.
58+
- After each ride, update the queue to reflect the groups' positions based on returning to the end of the queue.
59+
60+
3. **Earnings Calculation:**
61+
- Calculate the earnings generated from each ride based on the number of filled seats.
62+
- Keep track of the total earnings obtained from all rides throughout the day.
63+
64+
4. **Optimization:**
65+
- Optimize the simulation process to minimize unnecessary computations.
66+
- Consider ways to handle edge cases efficiently, such as when the queue size exceeds the capacity of the roller coaster or when there are fewer groups than the number of rides.
67+
68+
5. **Algorithm Design:**
69+
- Design an algorithm that efficiently utilizes available data structures and operations to perform the simulation and earnings calculation.
70+
- Ensure that the algorithm accounts for all the specified rules and constraints of the roller coaster attraction.

0 commit comments

Comments
 (0)