Heuristically split existing solar capacities 50:50 between rootop and utility scale#2088

Open
lindnemi wants to merge 2 commits intomasterfrom
existing-rooftop-solar
Open

Heuristically split existing solar capacities 50:50 between rootop and utility scale#2088
lindnemi wants to merge 2 commits intomasterfrom
existing-rooftop-solar

Conversation

@lindnemi
Copy link
Contributor

@lindnemi lindnemi commented Feb 19, 2026

Differences in the myopic test case are minor and occur at only one bus, but are aligned with the purpose of this change.

Before:
image

After:

image

2030 values change, but 2050 values are little affected

Checklist

  • I tested my contribution locally and it works as intended.
  • Code and workflow changes are sufficiently documented.
  • Changed dependencies are added to pixi.toml (using pixi add <dependency-name>).
  • Changes in configuration options are added in config/config.default.yaml.
  • Changes in configuration options are documented in doc/configtables/*.csv.
  • For new data sources or versions, these instructions have been followed.
  • A release note doc/release_notes.rst is added.

@lindnemi lindnemi requested a review from fneum February 19, 2026 14:52
@lindnemi
Copy link
Contributor Author

50:50 is a heuristic value. Since rooftop share between countries differs largely, a spatially resolved split would be more accurate, but there is no data.

For the whole of the EU the current rooftop:utility split is probably 60:40 (according to https://www.solarpowereurope.org/insights/outlooks/eu-solar-market-outlook-2025-2030/detail)

I chose 50:50 because some countries may be well below 60:40 and since rooftop installations are declining. But perhaps 60:40 would be better

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant