Skip to content

update to yaml + added update url + added image#22

Open
hallo123wert wants to merge 2 commits intopelican-eggs:mainfrom
hallo123wert:yaml
Open

update to yaml + added update url + added image#22
hallo123wert wants to merge 2 commits intopelican-eggs:mainfrom
hallo123wert:yaml

Conversation

@hallo123wert
Copy link
Copy Markdown
Contributor

Description

  • Updated eggs to use yaml, added update url and added an image
  • Replaced parkervcp images with pelican-eggs images

Checklist for all submissions

  • Have you followed the guidelines in our Contributing document?
  • Have you checked to ensure there aren't other open Pull Requests for the same update/change?
  • Have you tested and reviewed your changes with confidence that everything works?
  • Did you branch your changes and PR from that branch and not from your master branch?
    • If not, why?:
  • You verify that the start command applied does not use a shell script
  • The egg was exported from the panel

@hallo123wert
Copy link
Copy Markdown
Contributor Author

I didn't edit the Haste server egg because the egg isn't working right now.

@gOOvER
Copy link
Copy Markdown
Contributor

gOOvER commented Jan 4, 2026

whats the problem with hasteserver egg?

@hallo123wert
Copy link
Copy Markdown
Contributor Author

hallo123wert commented Jan 4, 2026

whats the problem with hasteserver egg?

The repository where the Haste server was downloaded no longer exists.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants