@softwareengineerprogrammer
Copy link
Owner

@softwareengineerprogrammer softwareengineerprogrammer commented Dec 22, 2025

Description

Addresses NREL#443

Web interface links:

  1. Fervo_Project_Cape-4 (Phase II): https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=9ac891c2-afaa-4e9f-a8b5-49ba3c7adb6b
  2. Fervo_Project_Cape-5 (Phase I): https://gtp.scientificwebservices.com/geophires/?shared-geophires-result-id=f9e49b45-ca2b-4e77-8d69-fe3c833b75a9

TODO

  1. 🚧 SME review (reservoir engineering)
  2. Incorporate ATB updates: https://atb.nrel.gov/electricity/2024b/geothermal
  3. Calibrate exploration cost to https://atb.nrel.gov/electricity/2024b/geothermal
    1. Created tracking issue to update GEOPHIRES correlation :Update exploration cost correlation according to 2024b ATB NREL/GEOPHIRES-X#447
  4. 🚧 Documentation and references
    1. ITC
    2. Construction CAPEX schedule
    3. Approach & Methodology updates
      1. <general>
      2. TOD/ambient temp
      3. OCC vs total capex
    4. Clarify calibration of drawdown/redrilling wrt 1-2% expected annual decline
  5. 🚧 Sensitivity analysis: https://github.com/scientific-web-services/geophires-fpc4-sensitivity-analysis
    1. Flow rate text overlap
    2. Link titles (on hover)
  6. Multiple construction years: Update Fervo_Project_Cape-4 based on publicly stated timelines - https://fervoenergy.com/fervo-energy-raises-462-million-series-e-to-accelerate-geothermal-development-and-meet-surging-energy-demand-with-clean-firm-power/
    1. Phase II: 500 MW: Fervo_Project_Cape-4
    2. Phase I: 100 MW: Fervo_Project_Cape-5: 71607b7
  7. Reservoir engineering updates
    1. ~8.5" ID
    2. Flow rate
    3. Fracture surface area
    4. PI/II instead of impedance
    5. Number of Fractures per Stimulated Well
    6. Increased lateral length (adjust fracture separation accordingly)
  8. Higher discount & bond rates

Testing & Verification

  1. Unit tests added: Retains test for previous version: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/117/changes#diff-77443b51920606ff05244e83370cb4bbd78fb8ee13076d9356d5051c2c9fbef5
  2. Unit tests updated: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/117/changes#diff-35ea0c0b80463f35958a7d1d7396bad7ad397a7c8e8d96a49da5b90e756c7c7c
  3. Manually tested
fervo_project_cape-4-sensitivity-analysis-lcoe fervo_project_cape-4-sensitivity-analysis-irr fervo_project_cape-4-sensitivity-analysis-project_npv

Change Checklist:

Observe the following checklist items if your change includes a new version (see versioning notes and version management docs).

Before merging:

  1. Add a CHANGELOG entry (example). RST Template:
M.m.P: `TITLE <https://github.com/NREL/GEOPHIRES-X/pull/PR-NUMBER>`__ | `release <https://github.com/NREL/GEOPHIRES-X/releases/tag/vM.m.P>`__

After merging:

  1. Push tag(s) to GitHub: git push origin refs/tags/vM.m.P
  2. Post a change announcement to the GEOPHIRES Change Announcements Discussion (example). Markdown template:
M.m.p: [TITLE](https://github.com/NREL/GEOPHIRES-X/pull/PR-NUMBER) | [release](https://github.com/NREL/GEOPHIRES-X/releases/tag/vM.m.P)

@softwareengineerprogrammer softwareengineerprogrammer changed the title Project Cape MCY and Reservoir Engineering updates Project Cape Construction (MCY) and Reservoir Engineering updates Jan 1, 2026
@softwareengineerprogrammer softwareengineerprogrammer changed the title Project Cape Construction (MCY) and Reservoir Engineering updates Project Cape Construction Timeline (MCY) and Reservoir Engineering updates Jan 1, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants